发行说明


|36.2 更改节点状态

|以下是对“Query Patroller Administration Guide”的“Node Administration”一节的更新。

| |Use the following procedure to change the node status:

  1. |On the Node Administration page, select a node.
  2. |Click on View / Edit.

    |The Detailed Information |for Node window opens.

  3. Select the new status in the Status Requested field.
    |注意:
    Status Requested |is the only field in the Detailed Information for Node window that can be |changed; all other fields display values that have been supplied by DB2 Query Patroller. |
  4. |Click on OK. |

|The following list provides information for each node parameter:

|Node ID
|Provides the ID for the node.

|Node Status
|Contains the current node status:

|Status Requested
|Indicates what the node status will be changed to:

|Date/Time Last Status
|Indicates the date and time node status was last changed.

|Scheduled Jobs
|Provides the number of jobs scheduled to run plus the number of jobs |running on this node.

|CPU Utilization
|Provides the CPU utilization of the node as a percentage (0 - 100). |If CPU utilization information is not being collected, the value is -1.

|Disk Available
|Indicates the bytes available in the file system where results are created. |If disk utilization is not being monitored, the value is -1.

|Node Manager PID
|Indicates the process ID of the node manager process. |


[ 页的顶部 | 上一页 | 下一页 | 目录 | 索引 ]