Release Notes


|37.2 Changing the Node Status

|The following is an update to the Node Administration section of the Query |Patroller Administration Guide.

| |Use the following procedure to change the node status: |

  1. |On the Node Administration page, select a node.
  2. |Click on View / Edit.

    |The Detailed Information for Node window opens.

  3. |Select the new status in the Status Requested field.
    |Note:
    Status Requested is the only field in the Detailed Information |for Node window that can be changed; all other fields display values that |have been supplied by DB2 Query Patroller. |
  4. |Click on OK. |

|The following list provides information for each node parameter: |

|Node ID
|Provides the ID for the node.

|Node Status
|Contains the current node status: |

|Status Requested
|Indicates what the node status will be changed to: |

|Date/Time Last Status
|Indicates the date and time node status was last changed.

|Scheduled Jobs
|Provides the number of jobs scheduled to run plus the number of jobs |running on this node.

|CPU Utilization
|Provides the CPU utilization of the node as a percentage (0 - |100). If CPU utilization information is not being collected, the |value is -1.

|Disk Available
|Indicates the bytes available in the file system where results are |created. If disk utilization is not being monitored, the value is |-1.

|Node Manager PID
|Indicates the process ID of the node manager process. |


[ Top of Page | Previous Page | Next Page | Table of Contents | Index ]