===================================================================================
IBM®
WebSphere® Business Modeler Advanced Version 6.0.2
Interim Fix 1 Readme
===================================================================================
© Copyright International Business Machines Corporation 2006. All rights
reserved.
This is an interim fix for WebSphere Business Modeler Advanced Version 6.0.2.
Installing the interim fix
Fixes included in this interim fix
The following information describes how to apply this interim fix to your
WebSphere Business Modeler installation.
To install the interim fix, complete the following steps:
- Download the
6.0.2-WB-ModelerAdv-IF0000001.zip file.
- Double-click the
downloaded 6.0.2-WB-ModelerAdv-IF0000001.zip file, and extract the files into
a temporary directory. The rest of these instructions assume that the
files have been extracted to C:\temp\.
- Start WebSphere Business
Modeler.
- Click . The Install/Update
wizard opens.
- Select Search for new
features to install, and click Next.
- On the Update sites to visit page, click New Local Site. The Browse for Folder window opens.
- In the Browse for
Folder window, navigate to C:\temp\6.0.2-WB-ModelerAdv-IF0000001, and
click OK. You return to the wizard, and
the site that you specified is included in the Sites
to include in search list.
- Select the site that you have just added, and click
Next.
- On the Search Results page, click Select
All.
- Click Next.
- On the Feature License page, read the license
agreement for the feature that you are installing. When are you are finished,
accept the agreement by clicking I accept the terms
in the license agreement, and then click Next.
- On the Install Location page, click Finish.
- Follow the on-screen instructions to complete the
installation. During the installation, you must confirm that you want to
install an unsigned feature.
- When you are asked if you want to restart the workbench,
click Yes.
The interim fix is now installed.
This is a cumulative interim fix for WebSphere Business Modeler Advanced
Version 6.0.2.
Fixes included in Interim Fix 1
This interim fix includes the following fixes. The PMR number and APAR
identifier
associated with each fix have been included.
PMR Number |
Related APAR Identifier |
Description |
33515,724,724 54175,999,616 |
JR25437 |
When using a local repository, corrects corruption caused by splitting or splitting and
repositioning a connection
in a process diagram, specifically when the
Attributes view is open. |
54179,999,616 |
JR25714 JR25717 |
Corrects a problem with deleting a task from a process
diagram after deleting an input on the task.
|
54206,999,616 |
JR25713 |
Ensures that a process with multiple input criteria that have inputs of
the same type and that are correlated with the same output criterion can
be exported to WebSphere Process Server.
|
This interim fix includes the following fixes, which are associated
with APAR JR25722:
- Fixes a broken link to the what's new information in the Welcome view.
- Eliminates error messages for an input and an input criterion that share
the same name.